18 January 2010 -- IntelliGantt Add In for Microsoft Project 2007 Release
18 January 2010 -- IntelliGantt Release
Install IntelliGantt Add-In for MS Project (Build 4.0.0.169): Microsoft Project 2007 Add-In
Features
Usability
- Both -- When mapping fields to SharePoint, the SharePoint column name is included to help distinguish the exact column being mapped.
- Both -- When importing a project from Basecamp, a two-day default is assigned to every new ToDo Item.
Bug Fixes
- Both -- Clicking the 'Save as Default' checkbox in Workspace Settings was not immediately saving as default. (Thanks Rodney)
- Both -- WBS and ParentWBS calculations have been improved so they are not updated unnecessarily when synchronizing.
- Both -- Assignments now support the lastest Basecamp user account information. (Thanks Jay).
Open Issue
Requirements
- Both -- .NET 3.5 SP1 (included with install)
- Both -- Version 9 of C Runtimes (included with install)
- Add In -- VSTO 3.0 SP1 (included with install)
- Add In -- Microsoft Project 2007 Standard or Professional
9 September 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release
9 September 2009 -- IntelliGantt Release
Install IntelliGantt Add-In for MS Project (Build 4.0.0.163): Microsoft Project 2007 Add-In
Features
Usability
- Both -- When sharing a project, if there are local resources that do not have online counterparts, a message box asking if you'd like to map local resources appears. You can then map local resources to online resources.
Bug Fixes
- Add In -- Last update introduced an error importing from SharePoint task lists with 'Stay Connected' checked. (Thanks Carl)
Open Issue
Requirements
- Both -- .NET 3.5 SP1 (included with install)
- Both -- Version 9 of C Runtimes (included with install)
- Add In -- VSTO 3.0 SP1 (included with install)
- Add In -- Microsoft Project 2007 Standard or Professional
2 September 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release
2 September 2009 -- IntelliGantt Release
Install IntelliGantt Add-In for MS Project (Build 4.0.0.162): Microsoft Project 2007 Add-In
Features
Usability
- Both -- When setting the display format for Basecamp todo lists and items to 'None', IntelliGantt will remove any date information from the start or end of the display name.
Bug Fixes
- Application -- Copying and pasting an IntelliGantt Plus project file that had set its Culture Info to '1033' was causing a problem. (Thanks Stephanie).
- Add In -- SharePoint members that had been filtered were reappearing as MS Project resources. Deleted resources now stay deleted. (Thanks Ewan)
- Both -- SharePoint member filter for 'Ends With' was not hooked up properly. (Thanks Ewan)
- Both -- Nested Summary tasks were not creating the corresponding ToDo List in Basecamp.
- Both -- Tasks removed in IntelliGantt or MS Project with 'Add New Tasks' enabled were being recreated when synchronizing with Basecamp.
Open Issue
Requirements
- Both -- .NET 3.5 SP1 (included with install)
- Both -- Version 9 of C Runtimes (included with install)
- Add In -- VSTO 3.0 SP1 (included with install)
- Add In -- Microsoft Project 2007 Standard or Professional
28 August 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release
28 August 2009 -- IntelliGantt Release
Install IntelliGantt Add-In for MS Project (Build 4.0.0.161): Microsoft Project 2007 Add-In
Features
Usability
Bug Fixes
- Application -- Corrected an intermittant summary task deletion bug. (Thanks Erick).
- Application -- Corrected Actual Cost updates. (Thanks Janice).
- Application -- Corrected Priority updates within the Task Grid. (Thanks Janice).
- Add In -- Corrected standard rate parsing for locales using a comma as a currency delimiter. (Thanks Carlos)
- Both -- Exporting to Basecamp was broken. (Thanks several folks on this one)
- Both -- Updating to do list containment in Basecamp will properly update the task and summary task in IntelliGantt and the MS Project Add In. (Thanks Douglas)
- Both -- Start and/or Finish dates added to the Basecamp To Do Item or To Do List display name has been greatly improved. (Thanks Douglas)
Open Issue
Requirements
- Both -- .NET 3.5 SP1 (included with install)
- Both -- Version 9 of C Runtimes (included with install)
- Add In -- VSTO 3.0 SP1 (included with install)
- Add In -- Microsoft Project 2007 Standard or Professional
17 August 2009 -- IntelliGantt Add In for Microsoft Project 2007 Release
17 August 2009 -- IntelliGantt Release
Install IntelliGantt Add-In for MS Project (Build 4.0.0.159): Microsoft Project 2007 Add-In
Features
- Both -- New 'Resource Filter' form lets you decide which SharePoint or Basecamp members to exclude from a project. It supports Starts With, Ends With and Contains for the string matching. (More Information). Thanks Owen
- Both -- When a summary task has a linked milestone, synchronizing with Basecamp will set the milestone dependency on the To Do List.(Thanks Douglas)
Usability
- Both -- A helpful 'what changed' form pops up right after you've updated.
- Both -- Basecamp integration updated to used the latest REST API from 37 signals.
- Both -- vcredist_x86.exe was upgraded from Microsoft.
Bug Fixes
- Both -- MS Project standard rate values were being blanked when used in non-English locales. (Thanks Carlos)
- Both -- Importing from Basecamp and choosing to 'Stay Connected' was broken. (Thanks Tiffany)
- Both -- Basecamp login was not letting you supply alternate username and password after too many failures.
Open Issue
Requirements
- Both -- .NET 3.5 SP1 (included with install)
- Both -- Version 9 of C Runtimes (included with install)
- Add In -- VSTO 3.0 SP1 (included with install)
- Add In -- Microsoft Project 2007 Standard or Professional